Tampilkan postingan dengan label Model Railways. Tampilkan semua postingan
Tampilkan postingan dengan label Model Railways. Tampilkan semua postingan

Rabu, 08 Desember 2010

Is the Future Brightening for Britain's Railways?

I’m not a fan of privatisation, never have been, never will be. The idea of it for any vital service, for example hospitals, schools, or social services, having private business involved actually makes my skin crawl. Once there is profit involved, many companies try to minimise costs and maximise profit by stripping bare their services, to the detriment of the quality of service.

Indeed, this was what happened in 1997 when Railtrack took over the maintenance of the infrastructure of Britain’s railways. They stripped back the service, lost many of the knowledgeable staff they inherited from British Rail and sold off large parts of its assets to maintenance and renewal companies. As such, this resulted in an shortfall of engineering knowledge within the organisation, and as a result people sadly died. Thus, Railtrack was doomed after the Hatfield accident in 2000, in which there were 4 fatalities, as it couldn't tell anyone out exactly how many more accidents were waiting to happen. Subsequently, the state-owned, not-for-profit and largely unaccountable Network Rail took over the maintenance of Britain's railway infrastructure.

However, the private system remained in place above the tracks. This wasn’t a totally terrible situation, as the privatised railway companies cannot act as other industries do because of the nature of the industry. If you were to buy a car, companies would compete to produce the best products and use marketing to entice you to buy their model. Yet, ultimately, you’d be the one choosing which car to buy. Yet, the railway industry cannot really work in that way. For example, I’m live near Hampton Court station, thus, I am forced to use South West Trains and have no option about who I travel with as they are the franchise holder. Thus, because of this situation, the Department for Transport has to ensure that the services are put on by SWT to suit the needs of the passengers, so that they don’t just run the profitable peak-time services. Thus, private companies cannot act as they do elsewhere as they correctly forced by government to provide a certain level of service, which means I am guaranteed the ability to travel.

However, under the system that emerged after 2002 unnecessary things happened to both Network Rail (NR) and the Train Operating Companies (TOC). Firstly, Network Rail’s costs have skyrocketed because of bad management, institutionalised mind-sets and a lack of accountability to anyone. The best estimate is that currently NR is 30 to 50% more expensive per mile than the best European operators. This is because NR, in light of the accidents its predecessor caused, became overly focussed on safety as being its primary role. Indeed, money is spent on works whatever, even if the risk of a failure of a piece of railway infrastructure is less than 5%.

This sounds like I am advocating lax safety, I’m not, and there some elements of railway infrastructure that should receive these levels of investment. But think about it; if you attempted to make every workplace in the world 100% risk free it would be impractical, costly and time consuming. Further, on the roads there are 100s of deaths a year. But if we spent money on fitting them out with every device imaginable to stop accidents, the costs would be horrendous. Yet, on the railways that is what is done and it is simply unsustainable.

In addition, the added cost of this absolute focus on safety, is that NR has forgotten that part of its remit is to cooperate with the TOCs to deliver the best service to customers. Of course, many of the problems of cooperation between the organisations is the result of the Conservative government of 1992 separating the maintenance of the track from the operation of trains when privatising the industry. Some of the arrangements are pure lunacy. For example, if NR closes a line to make improvements that will benefit the TOC who operates it, it still has to pay compensation to the TOC. In addition there are a myriad of contracts between NR and the TOCs that foster contractual, rather than operational working relationships. Lastly, where in the days of British Rail the train drivers and station staff would know the the signalmen and track crews, now they do not cooperate. Thus, NR, while working in the same industry as the TOCs, very rarely acts like it has an interest in providing the best service to customers because their organisational mind-sets have separated.

The second thing that happened was that the DfT has increasingly micromanaged the Train Operating Companies to the point where literally nothing that they do is of their own making. The DfT’s control over the franchises, which was originally in place to ensure that passengers would receive a good service, has gone over the top. The effect has been that the innovation that private companies can bring to the table, and which is sometimes lacking in nationalised companies, has withered and almost died. Therefore, instead of the DfT specifying how many trains a company should run per hour, it now specifies how many there should be and when they should run. It also tells the TOCs how long their trains should be and what types of rolling stock they should use, diminishing their incentive to buy new carriages themselves. Thus, the DfT have effectively stifled any innovation that the private companies had.

Thus, because of these and other problems, that I simply do not have the space and time to go into, organisations that should have been dynamic and innovative simply stagnated. The result was that costs soared, and whereas in the early 1990s Britain’s taxpayers contributed around 40% to the running of the railways, currently the contribution is around 50%. As such, in February 2010 the former Secretary of State for Transport, Andrew Adonis, appointed Roy McNulty to head a review of the structure and costs of Britain’s railways. Yesterday, McNulty published his interim findings. Firstly, they explained the current problems with the industry. However, they also spelled out proposals that might actually make the railways more cost-effective, innovative and provide better services to customers.

Firstly, and this is something that I have banged on about before, he suggested that there should be a more focussed definition of what the railways are actually for, with ‘greater clarity and better alignment of objectives.’ The long-term goals should be to facilitate the efficient movement of goods and passengers, while ensuring the industry’s long term value for money for both the taxpayer and the passenger. While naturally people will scream and shout about fares, and I will shout with them too, reducing the cost of NR is absolutely necessary and in the long-term may actually help to bring fare prices down. But, crucially, it will also bring the contribution of the taxpayer down.

Secondly, he wants the ‘Government [to be] involved in less detail, and the rail industry accepting greater responsibility for delivering the broad objectives set by Government.’ The report also recommends longer franchises of 15 years or upwards. These are excellent recommendations. Of course, the DfT has to ensure that passengers have a minimum level of service, but if the TOCs have more freedom to innovate, buy their own rolling stock and have longer franchises, they may invest in a better service to tempt you away from other forms of transport, as this will increase their long-term revenue generation.

Third, he suggests more cooperation, coordination and goal-alignment between NR and the TOCs that will focus both on both cost reduction and the provision of good services. Indeed, while he recognised that some technical functions have to be managed nationally and can only be done by a single organisation, he argued that regional alliances should be formed and closer working initiated between local NR mangers and the TOCs. This will allow both the organisations to operate more harmoniously, plan future operations better, have improved leadership and focus on the needs of the service in a local area. Ultimately, with such an approach, costs can be driven down. This will be accompanied by a reorganisation of NR, which is sorely needed and better overall leadership of the industry from the DfT.

I will always support renationalisation, but I accept that this reality won’t come soon. As such, my philosophy is that we should try and make the private system work as well as it can. There will always be issues, and I feel that the imminent fare hikes are a mistake. Yet, this said, I am very pleased with the initial findings of the McNulty report as he has echoed what many in the railway press and industry have been saying for years. Hopefully his recommendations, the implementation of which will be overseen by a high level group chaired by the Secretary of State for Transport, Philip Hammond (a man I am begrudgingly starting to not dislike), will usher in an era when the private system finally starts to work as efficiently as it can. We still have a government which I dislike intensely and I will always remain cautious about any proposals that emanate from it, but I always try and remain positive, and as such I think that the future is brightening for Britain’s railways.

Senin, 13 September 2010

Keeping Railway Modelling Interesting - Revelations at Woking

Woking Model Railway show was my destination yesterday morning. Held at the leisure centre, this event is one of the local highlights of the model railway fraternity’s year. With 69 stands, of which 26 were layouts, it has always been a good show, getting the balance between model railways, trade and societies, just right. This year I was surprised to see that there was also a stand by the South Western Circle, the support group for all things London and South Western. This made me smile.

It had been quite some time since I had visited a model railway show. It is not for lack of wanting to go to some of the local ones, I just haven’t had the time. The virtue of the Woking show being quite small, while at the same time being rich in content, is that the contrast between the different types of layouts come more into focus. Now, I can hear a cry that all layouts are different, that no two alike. I beg to differ, layouts can be the same in ways that go beyond the aesthetic level. In some ways layouts are, in my head at least, divided into those that are innovative and interesting, and those that are formulaic, boring and don’t try and do anything new.

Firstly, there were a number of layouts at the Woking show that I only gave a passing glance to as they were simply long ovals of track, small ovals of track, Great Western (far too much of that) or their scenery was very sparse. I’m sorry, but I honestly have seen layouts of this type far too much in my life. Take for example one layout that was simply a long oval of track, with a junction at one end and the obligatory station with a yard. If I could count the number of times this layout format has appeared at shows, I would be counting all day. While it may satisfy the children, as they are mesmerised by the whizzing trains, I get the impression that kids are generally enticed by any form of train-related movement. Therefore, in my head at least, the layout in question was aimed at no one. It was a club layout that really should have stayed at home or in the club room.

In my opinion, it is simply too easy to do a layout that is uninteresting. The layouts that really encapsulate me, which make me stay and watch for a while, are those that try to innovate and try and do something different. I have roughly sorted the categories out. First there are the ‘time-shift’ layouts, those that try and model an era of railway history that is under-represented. So, for example there are very few pre-grouping layouts doing the rounds. Modelling the period before 1923 when there were 100+ railway companies seems to me to be an attractive prospect. But, alas, there are few modellers that’ll commit to such a task given the time needed to invest in such a project.

This said, there were two such layouts present at Woking, Ogden Fold (shown) and Hope-Under-Dinmore, that both modelled the London and North Western Railway. The second era that I think has had little attention, and which wasn’t represented at Woking, was the when British Rail went ‘Blue.’ However, given the lack of colour, for me this is a bit of a turn-off. I do hope to also venture into this period when I get the time, modelling the London and South Western Railway in the 1880 and 90s.

The second type of layout that really captures my interest are those that show areas of the rail network, past or present, that are different. I call these ‘snapshot’ layouts. My favourite layout at the show was Abbey Road. I have over the last few years become a fan of the underground. I don’t mean travelling on it; after all, that is a nightmare. What I do love is its unique and wonderful history. Therefore, this layout, that showed a mix of underground stock, with meticulous attention to detail at the line side, was a simply wonderful and unique layout (shown).

The second layout that held my interest was Lulworth Camp and Gas Works, a military layout which is set near an imaginary town in Dorset. Military layouts have appeared more frequently in recent years and this is a fine example of what can be done with a wartime setting. There are tanks, artillery pieces, trucks and men everywhere on this layout and it looks like a melee. However, it conveyed well the order that can be found in apparent chaos. Overall, we need more of these layouts and I am surprised that there aren’t more simply depicting ‘snapshots’ of railway operation. I have never seen a layout of a marshalling yard, and there are few that illustrate railway companies’ works or locomotive depots.

Lastly, there are the ‘journey’ layouts. These are divided into different sections which are all distinct from each other but interconnected. So, for example, a layout may have three sections, one being the works, one being the coal yard and another being the exchange sidings. The action on this layout takes place by trains going from one section to another and then to another performing a function. In essence, you, the observer, can follow an industrial process from start to finish or journey with passengers from one station to the next. A number of layouts that were present at Woking were of this ilk. These were Purbeck (shown), showing stone mining at that place and which contained some of the best modelling I have ever encountered, and Bourne Valley Railway, that was also narrow gauge. Of course, ‘journey’ layouts are much easier when using narrow gauge or the smaller gauges (such as N and Z). But, there seems to be no reason why with a bit of ambition there can’t be more of these layouts in the bigger scales.

Overall, if railway modellers want to keep people’s interest, if they truly want to draw people to the hobby, and if they want the public to turn up to shows and exhibitions, then there must be verity within the hobby. By trying to come up with innovative and interesting ideas for layouts within the three categories listed above, the railway modelling community can achieve this aim. Overall, I would like to just say that Woking Model Railway Exhibition was one of the best that I have ever been to. There was a very good range of layouts to keep everyone’s interest. The organisers clearly grasped the importance of not filling the halls with boring layouts.